Case Study
Energywise Pediatric Denistry
College Station, TX
Speed of construction and ongoing energy savings were crucial to the owner. The Enercept SIP panel fabrication was nearly flawless, considering the intricate layout. Out of nearly 300 panels, only one required simple modification. The circular tower panels and elliptical roof panels married up to the structural steel within 1/8". The erection of panels was fast and efficient. The areas with no steel constraints were completed in 2 days. The tower area took a little longer but had no complications.
Its performance has been exceptional:
Awards/Certifications:
Building Excellence Awards
BEA:
2014 Commercial Under 10,000 Sq. Ft. Winner